Purpose of the Bill

The bill aims to secure funding for the construction of a new water treatment plant in the city of Hastings, Minnesota. This plant will help in purifying the local drinking water by removing harmful substances.

Main Provisions

  • Funding: Allocates $45,700,000 from the clean water fund to be used by the Public Facilities Authority. This fund will be directed specifically as a grant to the city of Hastings.
  • Construction Project: The grant will cover the costs associated with the predesign, design, construction, and equipping of the Eastern Water Treatment Plant.
  • Contaminant Removal: The facility is tasked with removing perfluoroalkyl substances (PFAS) and nitrates from the city's drinking water supply.
  • Infrastructure Expansion: The funding will also facilitate the interconnection of the water supply to the Minnesota Veterans Home, ensuring clean water is accessible there as well.
  • Duration of Appropriation: This financial appropriation is a one-time allocation and will remain available until June 30, 2029.

Significant Changes

  • The bill specifically addresses the removal of PFAS, which are hazardous chemicals known for their persistence in the environment and potential health risks.
  • By securing this funding, the city of Hastings will be better equipped to manage and improve its water quality standards, benefiting public health and safety.

Relevant Terms

  • Clean water fund
  • Public Facilities Authority
  • Perfluoroalkyl substances (PFAS)
  • Nitrates
  • Water treatment plant

Bill text versions

Actions

DateChamberWhereTypeNameCommittee Name
April 06, 2025SenateFloorActionIntroduction and first reading
April 06, 2025SenateFloorActionReferred toEnvironment, Climate, and Legacy